INTERVENTION

ROSS DK SUPPORTS ACTIVITIES CONNECTED WITH
REMEDIAL WELL ENTRIES, INTERVENTIONS AND WORK-OVERS

LOGISTICS

LOGISTICS ARE SECOND NATURE TO ROSS DK AND WE PROVIDE OUR SERVICES WITHIN OIL&GAS, GEOTHERMAL AND OFFSHORE WIND

DRILLING

ROSS DK PROVIDES DRILLING MANAGEMENT WITHIN OIL&GAS AND GEOTHERMAL PROJECTS – WE FACILITATE THE ENTIRE PROJECT FROM BASIC SKETCH TO DRILLING AND PRODUCTION START

News feed

What a joy!

Friendship turned into partnership or vice versa – it is hard to tell. December 2020 marks a 25th year anniversary for the founders of Ross DK A/S Lars Andersen and Claus Pedersen. The two met as special drilling trainees at Maersk Drilling’s training sessions on a path to become drillers. This chance meeting set them on a course that has shown no signs of slowing down, and where they strive to have a daily catch-up with each other on business, sports and general headlines of the day.

Distant collaboration – How DO we do it?

During the current COVID-19 pandemic, we at Ross DK have also faced changes to our normal way of working. With the March close-down, we all had to quickly get used to working from home, tackling work, children and the balance between work time and private time all at the same time. So how do we do it? With smart thinking, reliable technology and a flexible growth mindset.

Drilling Engineering

  • Drilling Engineering
  • Conceptual well alternatives
  • Design of wells
  • Prepare drilling and workover programs
    • Including risk management and budget control
  • Drilling and workover project management
  • Drilling and workover supervision
  • Intervention services
  • Plug & abandonment services
  • Integrated logistics services
    • Land
    • Offshore
  • Handle permitting applications and regulatory filing

Reservoir Engineering

  • Wellbore design
    • Trajectory
    • Casing
    • Torque & drag
    • Tubing
  • Optimum wellbore flow design
  • Design & supervise well flow tests
  • Interference testing
  • Pressure transient testing
  • Analyse to quantify system productivity
  • Determine optimal development strategies
  • Integrated reservoir management
  • Asset management
  • Environmental Impact Assessment

Resource Quantification

  • Numerical simulation, conceptual modelling
  • Resource assessment

Exploration & Geosciences

  • Initial site investigation, including identification and assessment of existing documentation and data
  • Exploration programs including selection, planning, and supervision of geophysical studies, geologic mapping, and fluid sampling
  • Conceptual modelling, geologic modelling
  • Field development modelling & planning
  • Preliminary assessment reports and recommendations for initial-stage development activities
  • Well targeting and geologic prognoses
  • Wellsite geology
  • Temperature/pressure logging, well log planning and interpretation
    Well test planning, supervision, data collection, and assessment